We’re here to help with the planning, preparation, and installation that comes with every type of new construction and remodeling project. Use the resources provided and get us involved early to ensure your project runs smoothly.
If your project requires more than one meter or is a commercial, industrial, multi-family or crop dryer project, start here! You’ll be paired with a New Business Construction Consultant who will guide you through every step.
Representative
Phone
Use these forms for the construction of, or revisions to, single family homes and town homes where each unit will have its own service and meter.
Job Site Readiness Submission Form
Use these forms for the construction of, or revisions to, commercial and industrial buildings; apartment complexes; pole barns and garages; and townhomes that will have one service for all units and a multi-bar header.
Commercial/Industrial Load Revision Request
Commercial Meter Location and Sleeve Requirements
Customer Fuel Line Cutoff Valve
Hold Harmless Agreement for Early Installation of Gas Main and Service Facilities
Instructions for Ordering Additional Meters
New Gas Facilities Installation Agreement
Property Acquisition Rider to Agreement for New Installation of Gas Facilities
Residential Tear Down/Rebuild Meter Location and Sleeve Requirements
Service Disconnect/Reconnect Guidelines and Fees
Service Pipe Installation Charges
As the builder/developer for a project, it’s your responsibility to ensure all documentation provided to Nicor Gas is current and accurate. If you change any information you initially provide, it may affect our agreement. Changes to your original submission (e.g., site plan alterations, number of homes/units, equipment to be installed or pressure delivery requirements) can have an impact on our engineering estimates (service/meter size and pressure), construction estimates, and financial analysis, and should therefore be communicated to your Nicor Gas New Business Construction Coordinator as soon as possible.
If natural gas service is being initiated and a new meter needs to be installed, please complete the Residential Single Meter Service Request. If a meter already exists, please complete the Start Service Form.
Our preferred times of installation are between March 15th and November 15th.
From November 15 through March 15, Nicor Gas may encounter winter construction conditions that include but are not limited to frost, freezing and thawing, snow conditions, and adverse temperatures. If you request installation during this period and we determine we’re able to perform the work, you must agree to pay for Nicor Gas' estimated fully distributed cost of incremental activities required for installation if such winter construction conditions are encountered.
We recommend you apply for gas service once you have backfilled your foundation.
Please contact your New Business Construction Coordinator.
New construction services that are 60 feet or fewer from the front property line are free of charge, unless unusual conditions exist. Services that exceed 60 feet from the front property line will be billed an excess footage charge. Services for homes that were demolished and rebuilt will be billed a disconnect fee and a reconnect fee.
From November 15 through March 15, Nicor Gas may encounter winter construction conditions that include but are not limited to frost, freezing and thawing, snow conditions, and adverse temperatures. If you request installation during this period and we determine we’re able to perform the work, you must agree to pay for Nicor Gas' estimated fully distributed cost of incremental activities required for installation if such winter construction conditions are encountered.
Please review the Guidelines for Ordering Additional Meters to ensure all conditions are met. Then call us at 1.800.730.6114, option 3, to schedule an appointment for a meter set.
Leave the area immediately and tell others in the area to do so as well. Keep everyone away from the area until emergency assistance arrives.
Avoid touching anything that may cause a spark. This includes lighters, matches, cigarettes, flashlights, light switches, and telephones in the area of the suspected leak. Wait until you are a safe distance away before using your cell phone.
Call Nicor Gas at 888.Nicor4U (888.642.6748) and 911 once you are in a safe place away from the area of the suspected leak. Stay away until emergency personnel indicate it is safe to return.
Note: Always leave if you suspect a leak. Be aware that some people may not be able to detect the odorant because they have a diminished sense of smell or because the odor is masked by other odors in the area. Certain conditions may cause the odorant to diminish so that it is not detectable.
Spring and winter weather impacts projects the most. While an early spring can give you the opportunity to get a jump on a project, an early or long winter can cause delays.
For either situation, it’s best to plan ahead. Get us involved and apply early to avoid delays, additional costs, and to ensure all resources are readily available.
Also, be aware that most counties have requirements and/or restrictions regarding installation from November 1 through April 15. Please schedule your form and application submissions with this in mind.
Note: From November 15 through March 15, Nicor Gas may encounter winter construction conditions that include but are not limited to frost, freezing and thawing, snow conditions, and adverse temperatures. If you request installation during this period and we determine we’re able to perform the work, you must agree to pay for Nicor Gas' estimated fully distributed cost of incremental activities required for installation if such winter construction conditions are encountered.
From installation to usage, we’re committed to safely providing natural gas. Help us keep everyone safe by being up to date on safety precautions.
Sewer Line Safety for Contractors
Call JULIE at 8-1-1 before you dig.